Painted built-up beam with shear studs

HomeQuality & HSE

Quality, safety & process

Checked before it leaves the plant

NDT-certified engineers, documented inspection at every stage and a zero-accident target on every project.

Quality assurance & control

Zero-defect mindset

Every plate, weld and member is checked against approved drawings and international codes before it leaves the plant. NDT-certified quality engineers inspect and report at each stage.

VT

Visual inspection

Plate condition, dimensions and conformity to specification on receipt and after welding.

UT

Ultrasonic testing

Full-penetration and flange-to-web welds checked for depth and internal soundness.

MT

Magnetic particle

Detects fine surface and near-surface cracks along weld toes and longitudinal seams.

PT

Dye penetrant

Reveals surface-breaking defects in joints, connections and plates.

Quality documentation for every project

  • QPProject quality plan and Inspection & Test Plan (ITP)
  • WPSWPS / PQR register and qualified welders
  • MTCMill test certificate verification
  • IRDimensional, NDT and coating inspection reports
  • NCRNon-conformance reports with root-cause closure
Painted steel sections after inspection

Health, safety & environment

Zero harm, every shift

People are our most valuable asset. Our safety management system follows OSHA practice and Saudi Civil Defense requirements, with a zero-accident target on every project.

Risk assessment & permits

Method statements, risk assessments and work permits before every activity.

Daily toolbox talks

Short briefings on the day's hazards, lifts and controls for every crew.

PPE & equipment

Mandatory high-specification PPE and inspected lifting gear and tools.

Lifting & erection plans

Engineered crane and rigging plans for every heavy lift on site.

Environmental care

Licensed operation, waste segregation and controlled blasting and painting areas.

Inspections & audits

Site HSE inspections, incident reporting and lessons learned.

How we work

From enquiry to handover

  1. 1

    Enquiry & tender review

    Scope, drawings and specifications reviewed; clarifications raised early.

  2. 2

    Estimation & value engineering

    Tonnage take-off, programme and cost options presented to the client.

  3. 3

    Shop drawings & approval

    Tekla model, shop and erection drawings issued for consultant approval.

  4. 4

    Procurement

    Steel sourced from approved mills; MTCs checked against the specification.

  5. 5

    Fabrication

    CNC cutting, fit-up and welding to approved WPS on our automated lines.

  6. 6

    Inspection & release

    NDT, dimensional and coating checks per the ITP before release.

  7. 7

    Delivery & erection

    Sequenced delivery, lifting plans and erection by our own crews.

  8. 8

    Handover

    As-built records, inspection dossier and final snag closure.