HomePlant
Fabrication plant
500 MT a month from one Riyadh plant
Automated CNC lines laid out for a continuous flow from raw-steel yard to dispatch.
Fabrication plant & capacity
500MT / month
Metric tons of fabricated steel per monthUp to +150% with extended shifts
Built for volume and speed
Our Riyadh plant is laid out for a continuous flow of material, from the raw-steel yard to the dispatch area, with overhead cranes serving every bay.
Flexible shift patterns, a strategic raw-material stock and long-standing relationships with the Kingdom's main steel suppliers keep production running on fast-track national projects.
Step 1 of 8
Material receiving & MTC check
Machinery & equipment
| Equipment | Qty | Operation |
|---|---|---|
| Automated CNC production lines | ||
| CNC laser cutting machine for steel plate (12 m × 3 m bed) | 1 | CNC |
| Hydraulic straightening machine for sections | 1 | CNC |
| Automated fit-up / assembly machine for built-up sections | 1 | CNC |
| Submerged-arc welding (SAW) line for built-up sections | 1 | CNC |
| High-power mobile drilling machines | 10 | Manual |
| Welding, painting, handling & fleet | ||
| Welding machines, 400 A | 20 | Active |
| High-pressure industrial paint spraying machines | 3 | Active |
| Heavy-duty forklifts | 2 | Active |
| Overhead crane | 1 | Active |
| Transport vehicles (trailers, trucks, crew buses) | 5 | Active |
Next project
